Success Stories
Company: LTV –Copperweld - U.S. Structural Group
Market: Manufacturer of Structural Steel Tubing
Annual Revenues: $200 million
Problem:
LTV-Copperweld was constantly forced into a
position of borrowing convertible raw materials from various production runs to
meet spikes in demand in another production line. Copperweld’s Materials
Resource Planning (MRP) system did not support visualization of the stock outs
or inventory fluctuations that resulted from these practices. Consequently,
Copperweld suffered from inaccurate raw material inventory levels and periodic
shortages of vital materials in several production runs.
Ultra Solution:
Working directly with Copperweld IT
executives and Production staff, Ultra consultants designed a Raw Materials
Pipeline Model. Utilizing a custom
application and Microsoft SQL Server, this model extracted raw materials
inventory data, pipeline data, and finished goods orders and forecasts from the
operational systems. Detailed
conversion/precedence rules, and exceptions to rules, were acquired from the operational
system and interviews with the master scheduler. These rules allowed the Raw Materials Pipeline Model to simulate
raw-material consumption into the future.
Furthermore, Ultra Corporation technicians
designed a Decision Support System (DSS) and reporting writer, using Cognos, to
allow fast, graphical use of the information generated from the Raw Materials
Pipeline Model.
Benefits to Customer:
·
Stock-out
reduced significantly by giving suppliers longer lead times.
·
Scrap was
reduced by nearly 2%.
·
Raw materials
inventory reduced by 40%.